How a project actually runs, how long each phase takes, and what causes delays.
How does a project with Olive + Baxter start?
A project starts with a consultation, either at the Naperville studio or at your home, where the scope, priorities, and realistic budget range are established. From there the process moves into design and space planning, then material selections, then a fixed proposal, and only then into construction, no work is scheduled until the design and selections are locked.
How long does a kitchen remodel take?
A full kitchen remodel typically takes four to six months from the first design meeting to the final walkthrough. That breaks down into roughly three to five weeks of design and selections, eight to twelve weeks of cabinetry lead time after the order is placed, and five to eight weeks of on-site construction, and those phases overlap far less than most homeowners expect.
How long does a bathroom remodel take?
A full bathroom remodel generally runs six to ten weeks on site, with design and selections adding three to four weeks beforehand and any custom vanity carrying its own lead time. Powder rooms are faster; primary suites with custom cabinetry, a freestanding tub, and a tiled shower sit at the longer end.
How long does it take to finish a basement?
Finishing a basement usually takes eight to fourteen weeks on site depending on scope, with a wet bar, bathroom, or egress window work pushing toward the longer end. Permitting and inspection scheduling are typically the least predictable part of the timeline.
What causes remodeling delays most often?
The three most common causes of delay are cabinetry lead times, countertop fabrication, and appliance availability, none of which are labor problems. Cabinetry enters a manufacturing queue the day the order is approved, countertops cannot be templated until cabinets are installed and level and then take one to three weeks to fabricate, and a single back-ordered range can stall a project because the surrounding cabinetry was built to its dimensions.
What decisions should I make first in a remodel?
Make the slow decisions first and let the fast ones wait: layout, then cabinetry, then appliances by exact model number, then countertops. Tile, paint colors, and hardware are the decisions homeowners agonize over first, and they are the ones with the most schedule slack, they can be finalized well into construction without affecting the completion date.
When should I start if I want my kitchen done by the holidays?
To have a kitchen finished by Thanksgiving, design should begin by mid-August; a mid-September start is tight but workable, and an October start realistically becomes a spring completion. The constraint is not crew availability but the eight-to-twelve-week cabinetry lead time plus the fabrication window for countertops, which cannot begin until cabinets are set.
Can I live in my house during the remodel?
Most clients stay in their homes for single-room projects such as a bathroom, basement, or flooring installation. Kitchen remodels are livable with a temporary setup, a refrigerator, microwave, and sink relocated elsewhere, but whole-home renovations with work on multiple floors at once are usually easier to live away from for at least part of the schedule.
Do you handle permits?
Yes. Olive + Baxter pulls the required permits and coordinates inspections as the licensed general contractor of record for the project, including work in Naperville and the surrounding municipalities, each of which has its own requirements and review timelines.
Will Olive + Baxter take on a single room, or only large projects?
Olive + Baxter takes on single-room projects as well as whole-home renovations. A powder room, a stair runner, a set of window treatments, or one custom built-in are all normal scopes of work alongside full kitchen, bathroom, basement, and whole-house projects.